Short answer: pre-wire anything you might want in the next ten years, because cable is cheap at frame stage and expensive afterwards. That means data to every TV and work point, the control cable your lighting system needs, positions for keypads and touchscreens, power at window heads for motorised blinds, speaker cable to ceiling speakers, conduit to the TV wall, ceiling points for Wi-Fi, and one ventilated cupboard where it all comes together.
Get it on the plans before frame stage
The single most useful thing you can do is involve the integrator while the electrical plans are still being drawn. Once plasterboard is on, every extra cable means cutting, patching and painting. Decisions about the lighting platform (Control4, KNX or C-Bus) change what cable goes in, so they need to be made before rough-in, not after.
The pre-wire checklist
Network and data
- Cat6 to every TV point, study, and anywhere a computer or console may sit
- Ceiling cable for Wi-Fi access points, placed by a coverage plan rather than guesswork
- Data to outdoor areas, the garage and any detached studio
Lighting control
- The control cable your chosen system uses, run to every switch and keypad location
- Lighting circuits planned around scenes and rooms, not just where the switches sit
- Neutral at switch positions, which gives more flexibility for later devices
Keypads and touchscreens
- Keypad positions at entries, bedside, hallways and the garage door
- One or two touchscreen points, usually the kitchen and main living area
Blinds and curtains
- Power and a control cable at every window head where motorised blinds might go, even if you add the motors later
Audio and the TV wall
- Speaker cable to in-ceiling speaker positions in living areas, alfresco and the main bedroom
- A conduit from the TV position down to the cabinet or back to the rack, so cables can be changed later without opening the wall
- If a cinema room is planned, the full cinema pre-wire. See home theatre
The equipment rack
- One central cupboard where cables home-run to, with ventilation, dedicated power and room to work
- Close to the switchboard and NBN entry where possible
Security
- Camera, alarm sensor, intercom and access control positions cabled at the same time. Our security team covers this at Aucam Security
Common mistakes we see
- Leaving the lighting platform decision until after frame stage
- One Wi-Fi router in a cupboard expected to cover a two-storey house
- TV points with power and an antenna socket but no data or conduit
- No space allowed for equipment, so it ends up in a hot linen press
- Blind motors wanted after handover, with no power at the window heads
Questions people also ask
Can my builder’s electrician do the pre-wire?
Often, yes, and we are happy to work with the electrician on site. The important part is that the cable schedule is designed by whoever will program the system, so the right cable goes to the right places.
Which platform should I choose for a new build?
It depends on the house and how you want it to work. We compare them in Control4 vs KNX vs C-Bus.
What does it cost?
Pre-wire is a small part of the total. See what home automation costs in Melbourne.